A suspected leak in a boiler room must be treated as an actual incident until proven otherwise. The priority is the safety of personnel and the prevention of ignition sources.

Installation sequence

The site's emergency procedure is applied, the designated isolation systems are activated, and the responsible personnel are notified.

Avoidance of spark-generating actions

Do not arbitrarily operate electrical appliances or equipment that could create an ignition source in a suspected atmosphere.

Atmospheric monitoring

The presence of gas is checked using an appropriate and calibrated instrument, in accordance with the installation's procedures.

Ventilation

The designated ventilation system is used in accordance with the site's design. Do not improvise with equipment that is not suitable for the area.

Restarting

Operations are restored only after the cause has been identified and repaired, the required leak tests have been performed, and the atmosphere has been confirmed safe.