After the installation or major maintenance of a gas train, an organized commissioning must be performed before it is put into regular operation.
Inlet pressure
The upstream pressure is recorded at low and high load.
Regulator setpoint
It is confirmed that the downstream pressure remains stable and within the permissible limits.
Monitor and slam-shut
The setpoints and the correct activation sequence of the protection devices are checked.
Pressostat
Low and high gas pressure switches must be at the correct values to provide protection without unwanted trips.
Documentation
The final pressures, settings, and test results must be recorded for future maintenance and diagnostics.