After installing a buffer tank or hydraulic separator, proper commissioning requires measurements and not just a visual check.
1. Flow Rates
The actual flow rates of the primary and secondary circuits are checked.
2. Temperatures
Supply and return temperatures are measured on both sides.
3. Circulators
Verify that the speed and differential pressure correspond to the design specifications.
4. Sensors
Verify the correct positioning and logical reading of the buffer sensors.
5. Cycling
Monitor the compressor runtime to ensure the system does not undergo excessive start-stop cycles.