Before the heat pump is operated, the hydraulic circuit must be cleaned, filled, and properly vented.
Flushing
Removes metal filings, sludge, material residues, and other contaminants from new piping.
Filling
The system is filled to the appropriate pressure with all necessary valves in the correct position.
Venting
Air is removed from high points, manifolds, fan coils, and other parts of the network.
Before start-up
Pressure, flow rate, and filter cleanliness are confirmed before allowing the compressor to operate.