During renovations, the position of the kitchen, boiler, or other appliances often changes. Natural gas piping must not be moved arbitrarily like a simple water line.

New routing

The new route must be safe, accessible, and compliant with installation requirements.

Pipe sizing

Increasing the length or adding a new appliance may change the required diameter.

Passageways

New passages through walls, floors, or enclosed spaces require proper construction handling.

Post-work inspection

Before gas is restored, a leak test is performed on the entire affected section.

Installation update

Changes must be documented in the drawings or installation records where required.