1. Installation check
We confirm that valves, circulators, and sensors are correctly installed.
2. Flow regulation
We set each branch to the required flow rates.
3. Pressure check
We check differential pressure and behavior when zones open or close.
4. Temperature check
We compare supply and return temperatures in each circuit.
5. Recording
We record the final settings to provide a reference base for future maintenance.