1. Installation check

We confirm that valves, circulators, and sensors are correctly installed.

2. Flow regulation

We set each branch to the required flow rates.

3. Pressure check

We check differential pressure and behavior when zones open or close.

4. Temperature check

We compare supply and return temperatures in each circuit.

5. Recording

We record the final settings to provide a reference base for future maintenance.