Why a final inspection is necessary

Before an installation is handed over, it must be verified that the construction complies with the design and that there are no obvious failures.

Key inspection points

  • Proper circuit labeling.
  • Continuity of protective conductors.
  • Earthing status.
  • Correct polarity.
  • Insulation testing where required.
  • Protection device operation.
  • Voltage drop and load testing where necessary.

Goal

To ensure the installation is handed over clean, documented, safe, and easy to maintain in the future.