Why a sequence of checks is necessary

Random measurements often complicate the diagnosis more than they help. A specific sequence is needed.

Key steps

  • Power supply voltage check.
  • Phase and neutral check.
  • Load current measurement.
  • Continuity check where required.
  • Ground and insulation check when there is a relevant indication.

Goal

To identify the actual point of failure without unnecessary component replacements.