Why a sequence of checks is necessary
Random measurements often complicate the diagnosis more than they help. A specific sequence is needed.
Key steps
- Power supply voltage check.
- Phase and neutral check.
- Load current measurement.
- Continuity check where required.
- Ground and insulation check when there is a relevant indication.
Goal
To identify the actual point of failure without unnecessary component replacements.


